PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Lifting the slip forms at Elev. 4-Stair -2 3rd floor Facing South (800x600).jpg Stripped foundation walls at Elev. 7-Stair 4,5 Facing South (800x600).jpg Stripped foundation walls at Elev. 7-Stair 4,5 Facing South-East (800x600).jpg Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing North(800x600).jpg Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing South-East(800x600).jpg Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing West(800x600).jpg Anchor bolts survey (800x600).jpg Anchor bolts survey Column B-2(800x600).jpg Raised Slip forms at Elev. 1,2,3 3rd Floor Facing South-East (800x600).jpg
Previous pageNext page Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing South-East(800x600)
Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing South-East(800x600)